‘Best in class’ service ensured

From Design to build. Making construction reliable, simple, and transparent.

Track the progress of your house construction via our smart app

We provide with 340 quality checks conducted by our site engineers

No price escalations once the project starts. No Cost Overrun Policy.

Penalty charged on contractor when there is a delay in the project

Payment released to contractor after completion of each stage

5 years warranty on super & sub structure inc. underground sump

Only trusted and verified contractors are provided by us to ensure quality work

Quotations are very transparent and cover every detail that goes into the construction

Our Blogs & Articles

Check out our blogs and equip yourself with the best knowledge of the construction world

Have questions? We have all the answers!

What are the quality checks that you perform on the site?

We have our very own QASCON Checklist with 340+ Quality Checks. You can refer to the Quality section of the website.

Does Brick&Bolt provide loans as well?

Brick&Bolt assists the clients with the documentation part for the loan approval process. We have also partnered with a couple of banks and NBFCs for attractive interest rates.

What are the major factors on which house construction cost depends?

Construction cost of a house majorly depends upon the Super built-up area, Open area( ie Balcony, Utility), Quality of Construction material, and Interiors. Brick&Bolt provides various packages at different prices to suit your needs.

On what basis do you assign contractor to a project?

Brick&Bolt conducts a series of background checks on a contractor before they are allowed to work with us. These checks include document checks like the GST registrations, income tax filings etc. Then physical verification of the projects that are under construction as well as completed by the contractor are verified by the team from Brick&Bolt. Such contractors are then monitored and rated through a continuous assessment system so that the best contractors are alloted more projects.

Approximately how long does it take to complete construction of one floor?

It takes about 5 months for the first floor and another 1.5 months for every floor beyond that. Duration also varies depending upon the built up area, location, design complexity etc.

Does Brick&Bolt Include the interior with the construction and provide the complete package?

There are separate packages for interior works if you wish to get the interiors done through Brick&Bolt. We have also collaborated with a couple of boutique designer firms for amazing interiors at competitive prices.

What if the prices of the materials increase when the project is ongoing. Would there be a price escalation?

The pricing of our contracts is frozen on a stamp paper. Hence, the prices remain stable in most of the scenarios. Only in exceptional situations where there is a sudden spike in prices due to external circumstances, the price variation is to be paid by the client. On the other hand, if there is a price drop, clients get a price reduction for the same.

What is a super built-up area, built-up area, and carpet area?

Carpet Area is the total usable area inside the house that can be covered by Carpet. The carpet area excludes the balcony and other utility areas but does include the area covered by internal walls. Built-up Area is the sum of carpet area plus the area covered by the balcony, terrace, and other utility as well. The Super built-up area is the total sum of the built-up area and space occupied by common areas like lobby, staircase, elevator, shafts, clubhouse. This is often referred to as a saleable area.

Track construction project progress, deliverables, payments & more

Download App
close

Request For a Demo

Name:

Only alphabets allowed

Mobile:

10 Digits Required

Message:

Your Response has been submitted